Uzbekistan - Construction of 500 kV Power Transmission Line Talimarjan Thermal Power Plant - Sogdiana Substation with 500 kV Outdoor Switchgear at Talimarjan Thermal Power Plant (2012 - 2014)

Construction of 218 km of 500 kV single circuit transmission line between Talimarjan TPP and Sogdiana Substation; Construction of a new 500 kV outdoor switchyard at Talimarjan TPP; Bay extension at Sogdiana substation and the connection of the 500 kV HVTL Karakul - Guzar to the outdoor switchyard at Talimarjan TPP - Contract monitoring and works supervision

Client: SJSC Uzbekenergo

Financing: International Bank for Reconstruction and Development (IBRD)

 

Bangladesh - German Financial Cooperation with Bangladesh: Renewable Energy - Solar Home Systems II (2009 - 2011)

Promotion of solar home systems on a microcredit scheme - Performance monitoring of the partner organisations; Technical monitoring of SHS installations; Financial monitoring of the revolving fund for micro-credits; Investigation of environmental aspects

Client: Infrastructure Development Company Ltd. (IDCOL), Dhaka

Financing: Kreditanstalt für Wiederaufbau (KfW)

 

Pakistan - Technical Diagnostic of the Thermal Power Plants belonging to the Pakistani Public Generation Companies (GENCOs) (2010 - 2011)

Due Diligence Report, i.e. diagnostic of the existing 4,800 MW power plants to determine the technical feasibility of upgrading options (comparison of GENCOs' present performance with technological benchmarks, assessment of augmentation potential of existing infrastructure, recommendations for rehabilitation and replacement options) - Investment Plan: Evaluation of the financial feasibility of alternatives with the aim of obtaining funds / finance from various financial institutions

Client: Pakistan Electric Power Company (PEPCO)

Financing: Agence Française de Développement (AFD)

 

Bangladesh - Consulting Services for Energy Efficiency Program II (2009 - 2013)

Construction of new 132/33 GIS substations, a new 132 and 33 kV cable system and a 4 circuit 132 kV transmission line - Assistance in evaluation of bids, contract negotiations and contract award; Approval of design, final design and as-built documentation; Participation in FAT; Supervision of construction; Monitoring of training programme; Assistance in establishing an O&M concept; Assistance in commissioning and during defects liability and warranty period

Client: Dhaka Power Distribution Company Ltd. (DPDC), Dhaka

Financing: Kreditanstalt für Wiederaufbau (KfW)

 

Mongolia - Energy Efficiency Program I - New Turbine for Darkhan Thermal Power Plant (DTPP) (2009 - 2013)

Supply and installation of a new 35 MWe extraction condensing tur-bine, related steam turbine instrumentation and control, high-pressure and cooling water pipelines, a new cooling tower and electrical equipment for the 0.4, 6, 35 and 110 kV systems as well as of two new 40 MVA transformers; Erection of a new turbine house and control room - Tender documents; Bid evaluation; Contract negotiations and contract award; Coordination and supervision of site activities, commissioning activities: As-built drawings and O&M manuals

Client: Darkhan Thermal Power Plant (DTPP) and Ministry of Mineral Re-sources and Energy, Ulaanbaatar

Financing: Kreditanstalt für Wiederaufbau (KfW)

 

Syria - Consulting Services for the SMI Industrial Power Plant (100 MW), Phase 1 (2010 - 2011)

Study of the interconnection of the power plant to the national grid; Technical and economic evaluation of bids; Legal contract for the EPC contractor; Environmental impact assessment study

Client: SMI Syria Metal Industries, Damascus, Syria

Financing: SMI Syria Metal Industries, Damascus, Syria

 

Mongolia - Training of the Operation and Maintenance Personnel of Thermal Power Stations (1998 - 2006)

Assistance in the establishment of a new training organisation in ERDC - Training needs assessments; Planning and design of training facilities; Procurement of training equipment, training curricula, material and aids; Execution of specialized training on electrical and mechanical engineering; Management support; Elaboration of a marketing and financial concept; Development and implementation of a training monitoring and evaluation system.

Client: Energy Research and Development Center (ERDC), Ulaanbaatar

Financing: GTZ, Germany

 

Syria - Conversion of Al-Nasserieh & Zaayzoon Power Stations from Simple Cycle to Combined Cycle Gas Turbine Plants (2005 - 2008)

Installation of three heat recovery steam generators, one steam turbine generator set (165 MWel) including all necessary accessories and equipment, a dry cooling tower including all necessary accessories and a water treatment plant - Tendering and contracting; Financial and economic analyses; Operational and technical analyses

Client: Public Establishment of Electricity for Generation and Transmission (PEEGT), Syria

Financing: Arab Fund, Kuwait Fund

 

Syria - Evaluation of the Deir Alzzoor Power Plant (2003 - 2004)

Preparation of the technical and financial evaluation criteria; Evaluation of the technical offers; Evaluation of the financial offers

Client: Public Establishment of Electricity for Generation and Transmission (PEEGT), Syria

Financing: PEEGT and Kuwait Bank

 

Mongolia - Development of 6 Small Hydropower Plants within the Renewable Energy Programme and Assessment of Wind Power Development Opportunities (2002)

Feasibility studies; Establishment of a hydrological database; Assessment of wind power development opportunities; Environmental impact assessment

Client: Ministry of Infrastructure Development, Ulaanbaatar

Financing: Kreditanstalt für Wiederaufbau (KfW)

 

Philippines - Installation of a new 200 MW steam power plant in Mindanao (2000)

Fact finding mission to obtain basic data for a profitability analysis of a new steam power plant

Client: STEAG IPP International, Essen/Germany

Financing: National Financing Institution