Experience in Asia

Indonesia - Energizing Development (EnDev) Programme / MHPP²: Technical Inspection of Centralised Solar Power Plants (2013)

The MHPP² subcomponent of the Energizing Development (EnDev) Programme carries out five main activities for micro-hydropower: policy advice, monitoring and evaluation, capacity building, pilot projects, and information dissemination. It has been extended to include other renewable sources as well, in the present case centralised solar power plants (solar PV-based mini grids) - Establishment of a quality assur-ance system to secure a long-term operation of the plants; Technical inspection of 117 plants (verification of installed components, random check of performance); On-site individual training of plant operators; Concept and delivery of five regional 2-day technical training-of-trainers courses

Client: Ministry of Energy and Mineral Resources (MEMR), Directorate General for New and Renewable Energy Conservation (DGNREEC)

Financing: Deutsche Gesellschaft für internationale Zusammenarbeit (GIZ)

Bangladesh - Consulting Services for the Feasibility Study of the Transmission System Improvement, Western Zone (2014 - 2015)

Addition of system components to the 132 kV western zone network, construction of 70 km of 230 kV d.c. transmission line and extension of bays; construction of a new 230/132 kV substation with 230 and 132 line-, transformer and coupling bays, construction of a total of 3 new 132/kV AIS substations; addition of a 230/132 kV transformer in an existing substation - Feasibility study (network analysis, load flow calculation, analysis of socio-economic benefits); Preliminary line routing and substation area survey; Layout and design on feasibility level; Initial ESIA, mitigation measures and resettlement action plan (RAP); Cost estimate, economic and financial analysis of planned measures; Detailed line route survey; Full-scale ESIA for the selected technical measures (construction of 230 and 132 kV transmission lines and substations

Client: Power Grid Company of Bangladesh Ltd. (PGCB)

Financing: Kreditanstalt für Wiederaufbau (KfW)
 

Mongolia - Consulting Services for Modernization and Rehabilitation of Thermal Power Plant #4, Ulaanbaatar (680 MW, coal-fired) (2012 - 2014)

Cooling water cleaning system with filtration; Variable speed drives for 2 boiler feed water pumps; Reverse osmosis water treatment plant - Finalization of scope and basic design of measures; Tender documents, bid evaluation and contract negotiations for 3 lots; Coordination of works execution

Client: Thermal Power Plant #4 Co

Financing: Kreditanstalt für Wiederaufbau (KfW)

Uzbekistan - Construction of 500 kV Power Transmission Line Talimarjan Thermal Power Plant - Sogdiana Substation with 500 kV Outdoor Switchgear at Talimarjan Thermal Power Plant (2012 - 2014)

Construction of 218 km of 500 kV single circuit transmission line between Talimarjan TPP and Sogdiana Substation; Construction of a new 500 kV outdoor switchyard at Talimarjan TPP; Bay extension at Sogdiana substation and the connection of the 500 kV HVTL Karakul - Guzar to the outdoor switchyard at Talimarjan TPP - Contract monitoring and works supervision

Client: SJSC Uzbekenergo

Financing: International Bank for Reconstruction and Development (IBRD)

Bangladesh - Consulting Services for Energy Efficiency Program II (2009 - 2014)

Construction of new 132/33 GIS substations, a new 132 and 33 kV cable system and a 4 circuit 132 kV transmission line - Assistance in evaluation of bids, contract negotiations and contract award; Approval of design, final design and as-built documentation; Participation in FAT; Supervision of construction; Monitoring of training programme; Assistance in establishing an O&M concept; Assistance in commissioning and during defects liability and warranty period

Client: Dhaka Power Distribution Company Ltd. (DPDC), Dhaka

Financing: Kreditanstalt für Wiederaufbau (KfW)

Mongolia - Energy Efficiency Program I - New Turbine for Darkhan Thermal Power Plant (DTPP) (2009 - 2014)

Supply and installation of a new 35 MWe extraction condensing tur-bine, related steam turbine instrumentation and control, high-pressure and cooling water pipelines, a new cooling tower and electrical equipment for the 0.4, 6, 35 and 110 kV systems as well as of two new 40 MVA transformers; Erection of a new turbine house and control room - Tender documents; Bid evaluation; Contract negotiations and contract award; Coordination and supervision of site activities, commissioning activities: As-built drawings and O&M manuals

Client: Darkhan Thermal Power Plant (DTPP) and Ministry of Mineral Re-sources and Energy, Ulaanbaatar

Financing: Kreditanstalt für Wiederaufbau (KfW)

Bangladesh - German Financial Cooperation with Bangladesh: Renewable Energy - Solar Home Systems II (2009 - 2013)

Promotion of solar home systems on a microcredit scheme - Performance monitoring of the partner organisations; Technical monitoring of SHS installations; Financial monitoring of the revolving fund for micro-credits; Investigation of environmental aspects

Client: Infrastructure Development Company Ltd. (IDCOL), Dhaka

Financing: Kreditanstalt für Wiederaufbau (KfW)

Pakistan - Technical Diagnostic of the Thermal Power Plants belonging to the Pakistani Public Generation Companies (GENCOs) (2010 - 2011)

Due Diligence Report, i.e. diagnostic of the existing 4,800 MW power plants to determine the technical feasibility of upgrading options (comparison of GENCOs' present performance with technological benchmarks, assessment of augmentation potential of existing infrastructure, recommendations for rehabilitation and replacement options) - Investment Plan: Evaluation of the financial feasibility of alternatives with the aim of obtaining funds / finance from various financial institutions

Client: Agence Française de Développement (AFD)

Financing: Agence Française de Développement (AFD)

Syria - Consulting Services for the SMI Industrial Power Plant (100 MW), Phase 1 (2010 - 2011)

Study of the interconnection of the power plant to the national grid; Technical and economic evaluation of bids; Legal contract for the EPC contractor; Environmental impact assessment study

Client: SMI Syria Metal Industries, Damascus, Syria

Financing: SMI Syria Metal Industries, Damascus, Syria

Syria - Conversion of Al-Nasserieh & Zaayzoon Power Stations from Simple Cycle to Combined Cycle Gas Turbine Plants (2005 - 2008)

Installation of three heat recovery steam generators, one steam turbine generator set (165 MWel) including all necessary accessories and equipment, a dry cooling tower including all necessary accessories and a water treatment plant - Tendering and contracting; Financial and economic analyses; Operational and technical analyses

Client: Public Establishment of Electricity for Generation and Transmission (PEEGT), Syria

Financing: Arab Fund, Kuwait Fund

Mongolia - Training of the Operation and Maintenance Personnel of Thermal Power Stations (1998 - 2006)

Assistance in the establishment of a new training organisation in ERDC - Training needs assessments; Planning and design of training facilities; Procurement of training equipment, training curricula, material and aids; Execution of specialized training on electrical and mechanical engineering; Management support; Elaboration of a marketing and financial concept; Development and implementation of a training monitoring and evaluation system.

Client: Energy Research and Development Center (ERDC), Ulaanbaatar

Financing: GTZ, Germany

Syria - Evaluation of the Deir Alzzoor Power Plant (2003 - 2004)

Preparation of the technical and financial evaluation criteria; Evaluation of the technical offers; Evaluation of the financial offers

Client: Public Establishment of Electricity for Generation and Transmission (PEEGT), Syria

Financing: PEEGT and Kuwait Bank

Mongolia - Development of 6 Small Hydropower Plants within the Renewable Energy Programme and Assessment of Wind Power Development Opportunities (2002)

Feasibility studies; Establishment of a hydrological database; Assessment of wind power development opportunities; Environmental impact assessment

Client: Ministry of Infrastructure Development, Ulaanbaatar

Financing: Kreditanstalt für Wiederaufbau (KfW)

Philippines - Installation of a new 200 MW steam power plant in Mindanao (2000)

Fact finding mission to obtain basic data for a profitability analysis of a new steam power plant

Client: STEAG IPP International, Essen/Germany

Financing: National Financing Institution